Visual Tour

1911 Autobuggy engine as received.
Same engine, just another view. 
Disassembly of engine in progress. 
The tappet guides are rebushed and the roller tappets installed.   
Valve and valve cages ready for grinding, cleaning and reassembly.   
Valve and cage assemblies are ready to install.   
Engine assembly in progress. 
The assembled long-block and jackshaft are mounted onto the engine frame.
Engine is now ready for the test run. It was 30 degrees below zero the day of the test.   
The engine is running and all the vital signs are normal. Note the chains and hoist.  Every precaution was taken to avoid any mishap during the test.